Utah County Fire Marshal’s Office
Community Development
51 So. University Ave., Suite 120
Phone 801-851-8348
Provo, UT 84601
|
Permit Fee Schedule
(Effective January 1, 2009)
1. Above Ground Fuel Tanks: IFC 105.6.16 (2)
a. Aboveground fuel tanks up to 500 Gal. - includes plan review and site inspection $110.00
b. Permanent 500 - 1,100 Gal. fuel tanks - includes plan review and site inspection $135.00
c. Temporary 500 - 10,000 Gal. fuel tanks - includes plan review and site inspection $135.00
d. Additional tanks at same site (each) $20.00
2. Automatic Fire Sprinkler: IFC 105.7.1
a. Overview of plan(s), rough-in and final site inspection of the sprinkler or suppression system up to 10,000 square feet in area $260.00
b. Commercial $360.00
c. Over 10,000 sq. feet (per sq. foot) $0.025
3. Automatic Fire Suppression (Hood and Duct System) Per System: IFC 105.7.1
a. Inspection of plan(s), one visual inspection and one test for a fire suppression system that is
installed $180.00
4. Carnivals, Fairs: IFC 105.6.4
a. Inspection of plan(s), one visual inspection with an area of 1 acre of less $150.00
b. Over 1 acre per hour $40.00
5. Exhibits and Trade Shows: IFC 105.6.13
a. Plan review and one visual site inspection $150.00
6. Explosive Blasting Permit: IFC 105.6.14
a. Single event $110.00
b. Yearly (same location) $350.00
7. Fire Alarm System: IFC 907.1
a. Overview of plan(s), one rough-in visual site inspection and one test for final $180.00
8. Fire Code Yearly Inspection Fee: IFC 106.2
a. Basic fee for fire code inspection, review, office costs, enforcement, pre-plan and one follow-up
inspection. (Note: Each additional follow-up
inspection will be billed separately as a rate of forty
dollars per hour plus zone charge.) $110.00
i. Plus Zone Fee: (for travel time and distance)
(1) Zone 1: 10 or less miles one way $15.00
(2) Zone 2: 11 to 20 miles one way $30.00
(3) Zone 3: 21 to 30 miles one way $45.00
(4) Zone 4 Over 31 miles one way $65.00
ii. Additional structure fee (each building over 500 sq. ft.) $20.00
iii. Exception: Home occupancy business fire inspection (regardless of location) $50.00
9. Fire Hydrants and Valves: IFC 105.6.15
a. Plan review $150.00
b. Visual hydrant site inspection (each hydrant) $10.00
10. Fire Hydrant Test for Static, Residual Pressure and Gallons Per Minute (G.P.M.)
a. Per hydrant $95.00
11. Fire Pumps and Related Equipment: IFC 105.7.4
a. Overview of plans and one site inspection $159.00
12. Hazardous Materials: IFC 105.6.20
a. Hazardous materials storage site $110.00
b. Hazardous materials dispensing and use site $135.00
c. Hazardous materials waste production $50.00
d. Hazardous materials production/processing site $185.00
e. Hazardous materials minimal storage site $50.00
13. High Piles Storage: IFC 105.6.22
a. Plan Review (if required) $125.00
b. Site inspection $95.00
14. Hot-work Operation: IFC 105.6.23 $125.00
15. LP Gas (all tanks above 120 gallons water capacity): IFC 105.26.27
a. Above ground includes plan review and site inspection $95.00
i. Additional tank(s) each $20.00
b. Below ground includes plan review and site inspection $125.00
i. Additional tank(s) each $35.00
16. Open Burning: IFC 105.6.30
a. Annual yard clean-up $10.00
b. Agricultural-horticultural (2 year permit) $20.00
17. Outdoor Concerts: IFC 105.6.4
a. Plan review and one site inspection $125.00
18. Pyrotechnic Special Effects: IFC 105.6.36
a. Plan review and one site inspection (In addition to any other applicable fees) $150.00
19. Repair Garage: IFC 105.6.39
a. Plan review and one site inspection (In addition to any other applicable fees) $185.00
20. Site Plan Reviews: (Fire safety permit, all occupancies)
a. Single family dwelling, outside wildland-urban interface $185.00
b. Wildland-urban interface area $235.00
c. Duplexes, multi-family dwelling, planned unit development and apartments (minimum) $235.00
d. Commercial (minimum) $150.00
21. Spraying or Dipping: IFC 105.6.39
a. Plan review and one site inspection (In addition to any other applicable fees) $185.00
22. Standpipe and Basement Pipe Inlet Systems: IFC 105.7.12
a. Inspection of plan(s), one visual inspection and one test for a fire standpipe or pipe inlet system
that is installed $180.00
23. Tank Removal: IFC 3404.2.14
a. Per tank $125.00
24. Temporary Membrane Structures, Tents and Canopies: IFC 105.6.43
a. Plan review and one site inspection $185.00
Miscellaneous Permits and fees :
1. Late Payment Fee (applies 45 days after billing date) $50.00
2. Red Tag $150.00
3. Re-inspection after non-compliance of initial inspection $100.00
4. Stop Work Order: IFC 111.1 $150.00
|